2003 Design Build Projects |
|
|
Last
Updated |
8/23/2007 |
|
|
|
District |
PID |
County |
Route |
Section |
Project Number |
Project Description |
Cost Estimate |
Pre-bid Date |
Sale Date |
Low Bid |
Contractor |
Designer |
4 |
22174 |
ATB |
11 |
25.16 |
02-3000 |
REPLACE SUPERSTRUCTURE |
$ 9,600,000 |
7/18/2002 |
9/25/2002 |
$ 9,259,925 |
National Engineering &
Contracting Company |
Baker & Associates |
4 |
22229 |
SUM |
77 |
15.47 |
02-3001 |
REDECK AND PAINTING OF VARIOUS
STRUCTURES |
$ 1,375,000 |
7/18/2002 |
9/25/2002 |
$ 1,410,000 |
Great Lakes Construction Company |
Civiltech Engineering, Inc. |
7 |
24384 |
DAR |
705 |
11.02 |
02-3002 |
CULVERT REPLACEMENNT |
$ 250,000 |
7/10/2002 |
9/25/2002 |
$ 215,850 |
Brumbaugh Construction, Inc. |
Columbus Engineering
Consultants, Inc. |
4 |
19791 |
STA |
77 |
0.00 |
02-3003 |
4 LANE RESURFACING, REDECK, OVERLAYS, AND
PAINTING FOR VARIOUS BRIDGES |
$ 4,750,000 |
8/29/2002 |
11/20/2002 |
$ 4,764,330 |
Shelly Company |
Burgess & Niple Limited |
4 |
18718 |
SUM |
21 |
1.79 |
02-3004 |
REDECK THE BRIDGE |
$ 1,055,000 |
8/29/2002 |
11/22/2002 |
$ 999,400 |
Great Lakes Construction Company |
Civiltech Engineering, Inc. |
6 |
12769 |
PIC |
22 |
17.03 |
02-3006 |
REPLACE SUPERSTRUCTURE, REHAB
SUBSTRUCURE |
$ 4,990,000 |
9/12/2002 |
12/6/2002 |
$ 2,724,570 |
Ruhlin Company |
E.L.Robinson Engineering |
5 |
19821 |
GUE |
77 |
7.68 |
02-3005 |
BRIDGE DECK REPLACEMENT, BRIDGE
PAINTING |
$ 2,575,000 |
9/26/2002 |
12/6/2002 |
$ 1,997,110 |
Complete General |
Barr Engineering Inc |
4 |
23929 |
TRU |
11 |
9.08 |
02-3007 |
INTERCHANGE LIGHTING |
$ 1,988,000 |
10/17/2002 |
12/18/2002 |
$ 2,067,500 |
Miller Cable Co. |
Ralph & Curls |
11 |
20996 |
TUS |
77 |
7.55 |
02-3008 |
4 LANE MAJOR REHAB, BRIDGE
REPAIR |
$ 10,000,000 |
10/16/2002 |
12/18/2002 |
$ 8,444,900 |
The Shelly Company |
Lockwood, Lanier, Mathias, &
Noland |
5 |
24369 |
COS |
16 |
7.18 |
03-3000 |
MULTIPLE CULVERT REPLACEMENT |
$ 410,000 |
10/30/2002 |
1/8/2003 |
$ 481,152 |
Shelly & Sands Co |
Jobes Henderson $ Associates,
Inc |
6 |
23997 |
FRA |
270 |
1.52 |
03-3001 |
NOISE WALL PLACEMENT |
$ 605,000 |
12/4/2002 |
1/22/2003 |
$ 524,750 |
MP Dory Co. |
ADR & Associates |
|
|
Total: |
$
37,598,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|